Reuse Assistance Grant Progress Report

Sacramento County Reuse Assistance Grant Project (Part 4: November 1, 2002 to May 1, 2003)

 

Project Description

Sacramento County implemented a local ReStore in Sacramento County. The Habitat for Humanity International ReStore is a successful and replicable model that has been established in over 50 communities throughout the United States. Each ReStore uses diverted reusable building materials creatively to eliminate poverty housing and stave off deteriorating neighborhoods. Diverted construction and building materials are incorporated into Sacramento Habitat for Humanity houses and reduce construction costs while protecting the environment. Diverted materials not utilized in Habitat construction projects are stored and sold through the retail operations to increase Habitat building capacity, furthering its mission to eliminate poverty housing. Established a new ReStore to serve the Sacramento area, enabling the Sacramento ReStore to be entirely self-sufficient within 18 months of operation.

The steps required to accomplish their project are as follows:

Task 1.00: Start-Up Costs. (7/01 to 12/01)
Permit approval has been delayed while volunteers help in accomplishing requirements prior to filing fees and beginning the inspection process. Final phases include parking lot addition, parking lot striping, and upgrading restrooms to meet ADA compliance codes. These tasks are expected to be complete in early May 2003 and will allow full time operations as a retail site. Task 1.00 is estimated to be 90 percent complete.

Task 1.01: Acquire Telephone. (7/01 to 12/01)
Telephone service is fully operational serving the ReStore as well as the affiliate organization. Task 1.01 is 100 percent complete.

Task 1.02: Acquire Computer System. (7/01 to 12/01)
Three terminals provide service for retail sales captured in the ReStore. These provide basis sales functions in cash and inventory management. Ongoing upgrades will enhance their sales and usage of all products. Task 1.02 is estimated to be 90 percent complete.

Task 1.03: Acquire Cash Register System. (7/01 to 12/01)
Task 1.03 is 100 percent complete.

Task 1.04: Acquire Office Furniture. (7/01 to 12/01)
All office furniture has been acquired through in-kind donations. Task 1.04 is 100 percent complete.

Task 1.05: Acquire Alarm System. (7/01 to 12/01)
An ADT system for fire and intrusion protection has been installed. Task 1.05 is 100 percent complete.

Task 1.06: Acquire Fax Machine. (7/01 to 12/01)
Task 1.06 is 100 percent complete.

Task 1.07: Acquire Fixtures. (7/01 to 12/01)
Task 1.07 is ongoing via donations and trades with other nonprofits. While they have just enough to start up, through a trade valued at $6,000 for warehouse racking, their goal is to triple the current level of fixtures to be fully operations. Task 1.02 is estimated to be 90 percent complete.

Task 1.08: Acquire Copier. (7/01 to 12/01)
Task 1.08 is 100 percent complete.

Task 1.09: Acquire Outdoor Storage. (7/01 to 12/01)
The City of Sacramento approval for their design has been received and work with a partnering company has begun on construction at the time of this report. Task 1.09 is estimated to be 80 percent complete. 

Task 1.10: Acquire Lighting. (7/01 to 12/01)
For purposes of the initial opening, the current lighting is both adequate and functional. Designs for additional upgrades are planned. Task 1.10 is estimated to be 90 percent complete.

Task 1.11: Install Tenant Improvements. (10/01 to 12/01)
Minor improvements to meet safety standards for retail operation are estimated to be no more than $3,000. The fire sprinkler system is 100 percent complete and was donated. The remaining parking lot striping and restroom upgrades will utilize volunteer skilled labor. Task 1.11 is estimated to be 90 percent complete.

Task 1.12: Acquire Truck. (5/01 to 7/01)
A donation of a van as a second truck valued at $5,000 has been received. Some repairs were required to make road worthy and some upgrading of this vehicle is ongoing in order to ensure safe use by volunteer workers. Task 1.12 is 100 percent complete.

Task 1.13: Acquire Forklift. (5/01 to 12/01)
Task 1.13 is 100 percent complete.

Task 1.14: Complete Building Improvements. (9/01 to 12/01)
Awaiting final modifications per City of Sacramento staff. They do not expect any major expense in time or dollars. Task 1.14 is estimated to be 90 percent complete.

Task 1.16: Hire Manager and Other Staff. (5/01 to 5/03)
ReStore Manager, Gary Palmer, was employed November 1, 2002 at 30 hours per week. One part-time driver has also been hired. The need for additional paid staff is continuing to be evaluated. A position opening was listed on the SHfH Web site on April 12, 2003 for a part-time Assistant Manager. A volunteer staff for store operations is being assembled and trained to provide necessary support. Task 1.16 is 100 percent complete.

Task 1.17: Place Advertisements; Develop and Distribute Promotions. (11/01 to 2/02)
This is ongoing at minor levels until operational permits are received from the City of Sacramento. The ReStore has been listed in the California Materials Exchange (CalMAX). An in-kind donation of exhibitor's fees by the Recycled Products Division enabled a ReStore booth, staffed by volunteers and the ReStore Manager to distribute information at the 4th Annual Recycled Products Trade Show held at the Sacramento Convention Center on April 10-11, 2003. The SHfH Web site (www.shfh.org) has active linkage to ReStore information.  Since Task 1.17 is ongoing, the work done does not constitute a certain percentage.

Task 1.18: Purchase Office Supplies. (11/01 to 1/02)
Donations for most major office supply needs are being solicited. This will continue on an ongoing basis as needed. Task 1.18 is considered 100 percent complete.

Task 1.19: Execute Rent/Lease Agreement. (9/01 to 12/01)
Lease fees have been reimbursed through this Reuse Assistance Grant at $3,000/month for the months of July, August, September, October, and November 2002. Task 1.19 is 100 percent complete.

Task 1.20: Calculate and Pay Truck Expenses. (9/01 to 12/01)
Task 1.20 is ongoing as an operational cost. Costs for the period of November 1, 2002 through April 14, 2003 total $6,672.20. The work done does not constitute a certain percentage based on its ongoing nature.

DMV fees: $915.00
Insurance: $474.00
Truck repairs: $4,267.36
Fuel: $1,015.84
TOTAL: $6,672.20

Task 1.21: Secure Utility Services. (10/01 to 12/01)
Task 1.21 is 100 percent complete.

Task 1.22: Calculate and Pay Any Contingency Pre-Opening Operating Expenses. (10/01 to 12/01) 
As contingency expenses are inherently unanticipated, such costs during this pre-opening phase are estimated to be no more than $1,000. Operating expenses for future regular operation have been budgeted at approximately ten percent of revenue, as is characteristic in the other successful ReStore operations throughout the country. Task 1.21 is 100 percent complete.

Task 2.00: Acquire Inventory Materials Through Purchase. (7/01 to 5/02) 
All inventory materials have been acquired through in-kind donations. No purchases of inventory have been made to sustain the retail operation.

Task 3.00: Acquire In-Kind Inventory
Meetings with John Orr of the Superior California Building Industry Association (BIA) resulted in 150 letters being sent to BIA members in December 2002. The entire BIA mailing list has over 500 members. Responses and further inquiries from this first mailing to BIA members are being received.

Donated inventory materials are the foundation of the ReStore operation. Impressive donations are offered on a daily basis. At the time of their November 1, 2002 report the inventory materials were valued at $150,000. Since November 2002 the inventory has increased approximately $350,000 for a total of over $500,000. Inventory is growing daily. For example, while compiling this report, a volunteer driver in the ReStore truck picked up a load of large lighting fixtures and chandeliers (more than 25) some of which were estimated with an original retail value of $1,500-$2,000 each. The week prior, six new gas fireplace inserts (two complete with the gas burning logs) were donated with a retail value of $1,000-$1,500.

The current inventory materials donated to date are valued at an estimated $500,000 and continue to arrive on a daily basis as the community learns of the ReStore's existence. In the last six months they have already equaled the inventory that it took them more than a year to acquire. These inventory acquisitions have been secured without aggressive marketing or solicitation and without daily operation. Once they are able to open for daily retail operations, the frequency and volume of donated inventory materials is expected to continue to rise. The potential is even greater to receive more than initially planned; therefore, they anticipate a future need for increased square footage.

Task 4.00: Operating Expenses. (5/01 to 5/03)
Operating expenses are ongoing and do not constitute a percentage of completion.

Task 4.01: Run Ads for ReStore Manager. (5/01 until filled)
The manager position has been filled. Task 4.01 is 100 percent complete.

Task 4.02: Acquire VISTA Member. (9/01 until filled) 
This position has been filled. Interviews and advertisements to ensure that the current volunteer's position will be filled consequent to the end of their volunteer service period at SHfH are underway. Task 4.02 is 100 percent complete.

Task 4.03: Calculate Payroll Taxes and Benefits. (5/01 to 5/03)
With Task 1.16 complete, these calculations have been completed successfully for the coming year. Task 4.03 is 100 percent complete.

Task 4.04: Create Advertising and Signage. (5/01 to 5/03)
Volunteer hours are tracked through sign-in/sign-out sheets. Hours are entered into the volunteer participation database. The hours invested by community volunteers at the ReStore are as follows:

November 1, 2002 to December 31, 2002: 649.75 hours
January 1, 2003 to April 14, 2003: 1,451.75 hours
TOTAL: 2,101.50 hours

The value of volunteer labor donated between November 1, 2002 and April 14, 2003 has been calculated using minimum wage of $6.75/hour with a value of $14,185.

Through a creative partnership with the American Association of Retired Persons Foundation (AARP), the ReStore has secured the support of a daily, part time staff person. This individual's wages are paid by AARP while they are responsible for responding to all ReStore "Hotline Donation" communications/messages; scheduling donation pick-ups and dispatching the ReStore truck and volunteer drivers. This ReStore support person joined the operation on December 26, 2002 and as of April 15, 2003 during which time she has worked 300 hours. The value of labor through this partnership is valued at $3,000 for this initial four-month period.

Until daily operations have commenced, they cannot involve the number of volunteer resources ready to engage in community partnerships (e.g., ROP students, California Youth Authority (CYA), and Welfare to Work placements).

The total value of volunteer labor donated throughout the entire grant period is estimated to be $47,1875.

Task 4.05: Create Advertising Signage. (5/01 to ongoing)
Through the in-kind donation of professional graphic design services (detailed in the previous report), the ReStore's main brochure has been designed. The ReStore has been linked to the SHfH Web site. Temporary signage has been placed at the intersection of Richards Boulevard and North 7th Street, as well as on the entry gates to the ReStore warehouse facility to facilitate donors in dropping off inventory materials. Signage is being developed for the opening of daily retail operations. Task 4.05 is estimated to be 85 percent complete.

Task 4.06: Calculate and Monitor Vehicular Costs. (5/01 to ongoing)
The current value of the two donated vehicles is just under $35,000, accounting for depreciation of the larger vehicle and the donation of the van. As an ongoing task, the work done does not constitute a certain percentage. Donations for permanent ReStore logo on the truck and van are being solicited. This one item within this task is estimated to be 20 percent complete.

Task 4.07: Research and Obtain Accounting/POS Software. (5/01 to ongoing)
A donation was received to underwrite the purchase of the point-of-sale software and has been operational since August 1, 2002. Three computers, cash drawers, and bar code readers have been donated. Task 4.07 is 100 percent complete.

Task 4.08: Write Off Bad Debt. (5/01 to 5/03) 
No bad debt has been written off during this reporting period. With the opening of the retail operation, it is reasonable to anticipate some bad debt write-offs. Eight hundred dollars has been written off for the entire grant reporting period.

Task 4.09: Expand Online Banking Capabilities and Credit Card Scanning Hardware. (9/01 to 12/01)
Bid for services have been recommended. The ReStore Manager will investigate these options. No decision has been finalized at this time. Task 4.09 is estimated to be 65 percent complete.

Task 4.10: Establish Equipment Rental Partnership with Rental Company. (11/01 to 12/01)
As a result of donated trucks and forklifts, no further equipment rentals were required during this reporting period and are not anticipated for the immediate future. This task may be reopened should a future need arise.

Task 4.11: Design and Conduct Staff Training. (5/01 to ongoing) 
Management is investigating vendors willing to donate their professional skills to provide forklift-training certificates. The ReStore Manager is in the process of securing mandated employment posters for posing within the warehouse. As mentioned in the previous report, a former SMUD employee with years of management experience will implement a training program as the staff continues to grow and job descriptions are refined. Task 4.1 is estimated to be 50 percent complete.

Task 4.14: Establish Janitorial Services and Design Schedule. (10/01 to 12/01)
Since November 1, 2002, these tasks have been completed through the use of community volunteers, CYA member placements, and the part-time staff. As an ongoing function, the ReStore Manager will continually evaluate and maintain the janitorial requirements of this retail operation. It is not anticipated that a contracted janitorial service will be utilized. Because this is another continual function, the work done does not constitute a certain percentage.

Task 4.16: Acquire Postage Meter. (5/01 to 9/01)
The estimated start date for Task 4.16 is June 2002.

Task 4.17: Printing and Postage Meter. (10/01 to 12/01)
The search for a donated postage meter continues. (This item with this task is approximately ten percent complete.) One thousand ReStore information brochures were reprinted for the second time the first week of April 2003.

Task 4.18: Establish Alarm Monitoring. (10/01 to 12/01)
See Task 1.05.

Task 4.19: Establish Utility and Trash Services. (10/01 to 12/01)
Scott Newens and Gordon Howat have implemented a recycling program for materials at the ReStore. Waste Management, Inc. continues to provide their garbage service. Task 4.19 is 100 percent complete.

Task 5.00: Secure Lease of Warehouse. (7/01 to 12/01)
See Task 1.19. Task 5.00 is 100 percent complete.

Task 6.00: Ongoing Capital Expenditures. (5/01 to 5/02)
Lease payments have been made covering the period beginning July through November 2002. Payments for December 2002 through April 2003 are being submitted during the creation of this report. A request has been approved by the Reuse Assistance Grant manager to prepay the lease expenses equal to the balance of this grant minus the cost of the truck repairs. This is an ongoing task and as such, the work done does not constitute a certain percentage, except that submitted expenses for reimbursement will equal the full grant award of $50,000.

Task 7.00: Design Collateral Materials. (7/01 to 12/01)
The recruitment and information brochure was completed (see Task 4.04). The ReCycling Handbook and grand opening publicity are still in process. At the April 2003 Recycled Products Trade Show, the Director of Community Partnerships for SHfH met and secured an agreement for coordinating joint publicity opportunities surrounding the ReStore's grand opening, anticipated Spring 2003, with the Public Information Officer of CIWMB. Task 7.00 is estimated to be 50 percent complete.

Task 7.01: Design and Distribute Direct Mailer to Building Contractors. (3/01 to 5/02)
While design is 100 percent complete, the BIA letter still needs to be mailed to the remaining 66 percent of the mailing list. This entire mailing list will be utilized once more for grand opening notification. Task 7.01 is estimated to be 75 percent complete.

Task 7.02: Acquire PSA Spot Airtime. (10/01 to 5/02)
With the additional required restroom upgrades not yet completed, daily operations of the ReStore opening have been delayed until late Spring 2003 (anticipated by the end of May 2003) and has revised the timeline for this task. With assistance from the CIWMB's Public Information Officer, this task will move forward quickly. The Director of Community Partnerships has given some leads to the ReStore Manager and will meet in early May 2003 with the PIO to seek advice on the usage of the completed ReStore video utilization. Task 7.02 is estimated to be 60 percent complete.

Task 7.03: Design PSA Content. (10/01 to ongoing)
Task 7.03 is 100 percent complete.

Task 7.05: Submit Final Report to CIWMB. (5/01/02)
As of the submission of this report, Task 7.05 is 100 percent complete.

*Permission was obtained from grant recipient to publish project profile.