Operators should submit an application for RFI amendment for any change in design and operation. Never assume that a "minor" change will not require an application. The LEA should always make this determination rather than the applicant. LEA approval of RFI amendments should be considered on a case-by-case basis. Therefore, the following list of examples should be used as "rule-of-thumb" guidance only. Please contact your P&I Branch staff contact if you have any questions about a particular request for RFI amendment. Examples and Case StudiesImportant Note: The examples listed below have been provided by Local Enforcement Agencies. It must be understood that each solid waste facility has site specific environmental impacts and mitigations, as well as design and operational conditions. Each RFI is written differently, as is each solid waste facility permit and each environmental document. Therefore a change that might be approved through an RFI amendment for one site may require a permit revision at another; the contrary may also be true. Do not rely on this list without determining the exact facts at your site or facility and analyzing them under current law.
LEAs should consider cumulative impacts when reviewing an RFI amendment application package that contains multiple changes. To amend an RFI to reflect a change in owner/operator/address follow process described in LEA Advisory No. 47. Other Resources
|
|||||
|
Last updated: October 30, 2007 Permit Toolbox http://www.ciwmb.ca.gov/PermitToolBox/ Scott Beckner: sbeckner@ciwmb.ca.gov (916) 341-6328 |
|||||