California Environmental Quality Control Act (CEQA) Toolbox Initial Study Not Required |
|
|
There are a several reasons why an initial study may not be required. Statutory exemptionsStatutory exemptions are those granted by the Legislature. The exemptions may be complete exemptions, partial exemptions or special timing requirements. These types of exemptions can be found in CEQA Guidelines Section 1526018 et seq. Categorical exemptionsCategorical exemptions are a class of projects that have been determined by the Secretary for Resources not to have a significant effect on the environment. These types of exemptions can be found in CEQA Guidelines Section 1530019 et seq. Mandated EIRsThe State Legislature determined that certain types of projects should always require an EIR. These projects do not require an initial study because an EIR shall be prepared. A list of these types of projects can be found in CEQA Guidelines Section 15081.520. Predetermined EIRsIf the lead agency can determine that an EIR will clearly be required for the project, an Initial Study is not required but may be desirable. References:
|
||
|
Last updated: November 25, 2008 Permit Toolbox http://www.ciwmb.ca.gov/PermitToolBox/ Scott Beckner: sbeckner@ciwmb.ca.gov (916) 341-6328 |