Action Item 2
|
Incorporate life cycle costing, integrated design, commissioning, and
post-occupancy evaluation into the state's capital outlay program. |
Due Date |
|
2-1 |
Develop a methodology to analyze life cycle
costing for the full range of qualitative and quantitative sustainable
building benefits or their equivalencies. |
Ongoing |
|
2-1a |
-
Work
with the Department of Finance to review life cycle costing approaches,
policies, and legislation. Identify factors that can be calculated directly and indirect
measurements for other factors. Develop framework to bundle costs and benefits, treating the
building as one system rather than separate
components.
|
March 2002 |
|
2-1b |
-
Convene
a series of discussions with sustainable building experts to evaluate life
cycle costing methodologies (e.g., utilities, the federal
government).
|
Ongoing |
|
2-1c |
-
Conduct
a research study that addresses life cycle costing and the cost and
benefits of sustainable building.
|
May
2002 |
|
2-1d |
-
Establish
a methodology to incorporate these changes into the state’s
capital outlay program. The
methodology may include the need for further research, computer modeling,
and the creation of base case
buildings by facility type, size, and climate zone, to use for comparison
purposes.
|
June
2002
Ongoing |
|
2-2 |
Incorporate
an integrated design approach into the state’s
capital outlay process. |
Ongoing |
|
2-2a |
-
Propose
administrative changes to incorporate an integrated design approach.
Update process as required.
|
Annual
updates each December |
|
2-3
|
Work
with DGS to develop a post-occupancy evaluation
program. |
February 2002 |
|
2-3a |
-
Develop
a strategic plan and the criteria for conducting post-occupancy
evaluations.
|
Completed |
|
2-3b |
-
Integrate
post-occupancy evaluations into the design goals for select
projects.
|
Completed |
|
2-3c |
-
Conduct
a post-occupancy evaluation study on a sample of
buildings.
|
Ongoing |
|
2-3d |
-
Survey
significant buildings over the long-term and document performance, costs,
and savings.
|
Ongoing |
|
2-4 |
Work with DGS and the Division of the State
Architect to develop a commissioning
program. |
March
2002 |
|
2-4a |
- Convene
a series of meetings on developing a commissioning program.
|
February 2002 |
|
2-4b |
- Conduct
a symposium on commissioning.
|
Completed |