Sustainable Building Case Studies

The Gap, Inc.

Gap officue building in San BrunoLocation: 901 Cherry Ave., San Bruno, CA
Type of building:
Commercial office building
Size (Sq. ft.):
195,000
New construction
of a pre-cast concrete and glass office building
Date completed:
1998
Cost:
$60 million
Owner:
Gap Inc.
Designed By:
William McDonough + Partners, Design Architects, Gensler, Interior Designer and Ove Arup & Partners USA, Mechanical, Structural and Electrical Engineers

Sustainable Building Strategies

Native grass roof, raised floors, under-floor ventilation and wiring systems, 30% more energy-efficient than Title 24, daylighting, shading, operable windows, low VOC carpet, certified wood flooring, no added formaldehyde MDF, low VOC paint, recycled-content ceiling tiles, certified wood veneers, recycled-content Café countertops, recycled-content office furniture, and salvaged eucalyptus wood for interior benches.

Lessons Learned

Gap Inc. estimates a four-to-eight year payback period due to energy and operational efficiency measures included in the design.

Information Contact: Maria Moyer-Angus at the environmental office, (415) 427-2212
Web Site:
http://www.bayareacouncil.org/bp/bestpractices/bp185.html

Green Building Case Studies

 

Last updated: January 15, 2008


Green Building  http://www.ciwmb.ca.gov/GreenBuilding/ 
Gregory Dick:  gdick@ciwmb.ca.gov  (916) 341-6489
©1995, 2007 California Integrated Waste Management Board. All rights reserved.